Luminaires
Browse and manage all luminaires in the system.
| ID | Location | Floor | Type | Status | Last Test | Result | Actions | |
|---|---|---|---|---|---|---|---|---|
| L001 | Corridor A, Section 1 | Ground Floor | Maintained | Operational | 2024-05-15 | Pass | ||
| L002 | Corridor A, Section 2 | Ground Floor | Maintained | Faulty | 2024-05-15 | Fail | ||
| L003 | Stairwell B | All Floors | Non-maintained | Operational | 2024-05-15 | Pass | ||
| L004 | Office 101 | First Floor | Self-contained | Testing | 2024-05-15 | N/A | ||
| L005 | Office 102 | First Floor | Self-contained | Operational | 2024-05-15 | Pass | ||
| L006 | Reception | Ground Floor | Maintained | Operational | 2024-04-20 | Pass | ||
| L007 | Restroom Block A | Ground Floor | Non-maintained | Operational | 2024-04-20 | Pass | ||
| L008 | Server Room | First Floor | Maintained | Operational | 2024-04-20 | Pass |